Architecture Studio
Working with an architecture studio: scope, contract, responsibility
When you engage a studio, the outcome depends less on design talent than on how clearly the scope is defined. Most projects go wrong not because the design was poor but because nobody wrote down who would do what.
Three ways studios work
- Design only. The studio produces the project; your contractor builds it. Flexible and usually cheaper, provided the drawing set is complete enough to build from.
- Design with stage inspection. Somebody else builds, the studio inspects at agreed stages and signs off. Responsibility is shared.
- Turnkey. The same party designs and builds. One schedule, one point of contact, and nothing falls between the two.
All three can be right. What is wrong is beginning without knowing which one you are in.
What belongs in the contract
- The boundary of scope. What is excluded matters as much as what is included.
- The deliverables list. Which drawings, which details, how many revisions.
- Programme and delay. Which delays sit with whom.
- Payment. Tied to completed stages, not to dates — that protects both sides.
- Change control. How a client-requested change is priced and approved.
- Completion criteria. What counts as finished, and how the snagging list is handled.
Choosing a studio
A portfolio is necessary but not sufficient: photographs show the result, not the process. More revealing are these:
- Comparable work. An attractive residential portfolio says nothing about whether a studio understands the licensing and fire requirements of a shop.
- The construction set. Ask to see a sample. Without fabrication details, the site makes every decision itself.
- Site experience. A studio that has never run a site tends to draw details that cannot be built.
- A reference conversation. Speaking to the owner of a finished project tells you more than twenty photographs.
- Communication. Who is your contact, how often do you get reports, how are pending decisions tracked.
How we work
We look at the space with you and record its condition and how it is used. Scope, programme and an indicative budget reach you in writing, itemised, and the project runs on that document; if something has to change we speak to you first.
Because design and construction sit in the same team, responsibility does not fall into a gap. If you prefer design only, the set is delivered complete and your own contractor can build from it.
Frequently asked
-
Comparable work in type and scale, the contents of their construction set, site experience, a reference conversation with a previous client, and a clear communication routine. Asking to see a sample construction set is the quickest way to tell studios apart.
-
Against completed stages rather than calendar dates. Nothing is paid for work that has not progressed, and finished work is not left waiting. The stage definitions belong in the contract.
-
Not in itself, but the boundary of responsibility must be written down. If the designer does not inspect the works, it is unclear who decides when something does not match on site. Defining stage inspection as a separate scope solves that.
-
It should be stated in the contract. Changes at concept stage are normal and not charged; changes after the construction set is approved affect fabrication and are priced separately.